Muğla, Dalaman · Nisan 2008

Çaldere HPP operates with a system that generates energy without disrupting the natural flow of water, thanks to its run-of-river (regulator-type) structure and environmentally compatible design. The fact that a significant portion of the equipment used in the project is domestically manufactured highlights both its technical sustainability and the strength of local engineering.

In addition, following the completion of the construction process, comprehensive afforestation activities were carried out across all project areas. This enabled the site to be reintegrated into the natural ecosystem, adopting a sustainable and environmentally responsible approach.

Çaldere HPP was commissioned in April 2008 and has been continuously generating energy since that date.

Our facility, with an installed capacity of 8.91 MW, generates an average of 44 million kWh of energy annually.

Within the facility, Pelton turbine technology by Andritz brand is utilized.

Energy generation is achieved by diverting water from an elevation of 690 meters, conveying it through a 6,900-meter-long water conveyance channel, and delivering it via a 1,930-meter-long penstock — utilizing a total net head of 437 meters to generate electricity efficiently.

Technical Specifications

Licensed Installed Capacity8.91 MW
Average Annual Expected Generation44 Million kWh
Ratio of Equipment Manufactured in Türkiye52%
Annual Carbon Reduction20,060 Tons
TurbinePelton turbine by Andritz
Water Intake Elevation690 meters
Conveyance Channel Length6,900 meters
Penstock Length1,930 meters
Head437 meters
Coordinates36°56'02.8"N 29°00'00.0"E

8.91 MW

Installed power

44 million kWh

Annual output