Yılsan Yatırım Holding
Arı Su

Hydroelectric

Arı Su

Arı Su

Denizli, Çal · 12.12.2013

The Akbaş HPP project is at the downstream of the tandem Akkent-Çalkuyucak HPP along the Büyük Menderes River in Denizli’s Çal district. The project was completed and put into operation on 12.12.2013.Located close to the Akkent-Çalkuyucak HPP, the project was designed to have a weir, around 3-km tunnel, forebay pool and a penstock (65 m head 1.5 m diameter). The plant is capable of handling 19.6 m³ water per second.

Project construction was undertaken by Kuzey İnşaat Makina A.Ş while electromechanical equipment was supplied by the ANDRITZ Hydro (France) & INDAR consortium.

Proposed annual energy production capacity of the plant is 45.5 million kWh.

Technical Specifications

Project Flow19.60 m3/sn
Number of Units3 Francis Turbines
Installed Power12.502 MWe
Power Generated45,520,000 kWh

1 / 32